LF logo
by learnformula
search
Log in
search
Live Webinars>Electrical>
Power Gen and Distribution

Grid Ride-Through Compliance for Inverter-Based Resources

Date & Time: November 23, 2026 @ 2:00 pm - 3:00 pm EST + 15 min Q&A

schedule1 PDH hour
local_offerPower Gen and Distribution

About this webinar

As inverter-based resources become an increasingly significant part of the North American power system, grid operators are placing greater emphasis on ensuring these assets remain connected and support system stability during disturbances. The introduction of NERC PRC-029-1, effective October 1, 2026 for Bulk Electric System inverter-based resources, represents a significant shift in ride-through compliance by aligning requirements with IEEE 2800-2022 and establishing new expectations for plant performance, protection settings, and compliance documentation.

This webinar examines the technical and regulatory requirements for grid ride-through compliance under NERC PRC-029-1. Participants will explore voltage and frequency ride-through obligations, no-trip zones, current injection and dynamic voltage support requirements, the prohibition on momentary cessation, and the practical implications for solar, wind, and battery energy storage facilities. The session also considers plant design, protection coordination, modeling, commissioning, documentation, and audit preparation, providing engineers and asset owners with a practical framework for achieving and demonstrating compliance.

Key Topics Discussed:

  • Overview of NERC PRC-029-1 and implementation timelines

  • Applicability to Bulk Electric System and Non-BES inverter-based resources

  • Relationship between PRC-029-1 and IEEE 2800-2022

  • Voltage and frequency ride-through requirements

  • No-trip zones and disturbance response expectations

  • Prohibition on momentary cessation

  • Current injection and dynamic voltage support obligations

  • Protection settings and coordination considerations

  • Inverter controls and plant performance requirements

  • Modeling and validation of inverter-based resources

  • Commissioning and performance verification

  • Documentation and evidence required for compliance

  • R4 exemptions and supporting documentation

  • Audit preparation and regulatory expectations

  • Practical compliance strategies for solar, wind, and battery energy storage facilities

This webinar includes:

verifiedCertificate of completion
scheduleNo preparation required
bar_chartAppropriate for all levels
lock1 year access
infoNo prerequisites

Meet Our Expert Speakers

Stephan Tjaden
INSTRUCTOR
Stephan Tjaden•Senior Control and Automation Engineer | SLB

Stephan M. Tjaden is an automation engineer and control system design specialist with expertise in controls, power generation, and electrical grid systems. He has professional experience with SLB and ...

Get on-demand access to this webinar and 1,000+ courses. Upgrade to the Unlimited CPD Pass.

Unlimited access • Instant certificates • Credit tracker • Team admin & compliance reporting

Start 7-Day Free Trial

No charge today. Cancel anytime.

Reserve Your Seat

Limited spots available for live Q&A

Timezone:
(UTC-05:00) America/New_York (EST)
expand_more
calendar_monthMonday, November 23
schedule2:00 PM - 3:00 PM, EDT
attach_moneyCA$39
local_fire_department
Free with Unlimited Pass.Access to all courses / packages / webinars with active subscription.See Plans & Pricing
Stephan
Stephan Tjaden
500 spots available
SpeakerSpeakerSpeaker

Do You Want to Be the Next Speaker?

Share Your Expertise Globally With Over 1 Million Professional Learners and Earn Royalties for Life.